Descritiption of the project:
                        
                                    Construction of 2 new buildings, construction of post-shaped foundations, frame of metal structures (144.4 t), roof (4442 m2), floors (3900 m2) and walls (3431 m2), gates (7 pcs.). In addition, internal power supply networks were built, a low-voltage system and rain sewerage were built.                            
        
            
                            
Completed:
                        
                                    August 2019 - March 2020
                            
        
            
                            
Client:
                        
                                    Ingleby Dobele Agro LTD                            
        
            
                            
Project costs:
                        
                                    1 090 000 EUR                            
        
                
        
        
Date: