About the project:
New warehouse construction to the existing building, including groundworks, foundation construction, steel construction assembly, fibo block wall construction with finishing works, roof construction, internal finishing works, window, door and gate assembly, stair construction, electrical installation, water and sewerage system construction, surface water drainage construction, heating and ventilation system construction, concrete cobblestone parking place construction.
Realized:
12.2016. – 04.2017.
Client:
JSC “Tērvetes AL”
Costs:
380 000 EUR
Date:
September 7, 2017