About the project:
                        
                                    Construction of new agricultural storehouse, including groundworks, steel construction assembly, electric installations, sub-floor ventilation installation, surface water drain, roads and fields construction                            
        
            
                            
Realized:
                        
                                    05.2016. - 08.2016.                            
        
            
                            
Client:
                        
                                    Meiera Z/S Mazbaldonas (Agricultural household)                            
        
            
                            
Costs:
                        
                                    300 000 EUR                            
        
                
        
        
Date:
        September 13, 2017