Sigulda sports complex

About the project::

Completed general construction works, including beam and strip foundation construction and insulation, sandwich panel external walls (3220 sq. m.) and façade decorative element construction, roof construction (5196.4 sq. m.), external grounding (earthing) construction, plasterboard, sandwich panel and brick partition wall construction, wall finishing works, including tiling, painting, plastering up, suspended ceiling installation (2147.6 sq. m.), floor construction, including concreting (7281.8 sq. m.), tiling, certified sports floor construction (3149.3 sq. m.), linoleum floor installation, swimming pool waterproofing, tiling and installation of equipment and Omega Timing system according to requirements of Swimming Federation of Latvia, track and field athletics, basketball, volleyball, indoor football, badminton, long jump, aerobics equipment assembly, glass façade and window (682.6 sq. m.), door (359.6 sq. m.) and vitrine assembly (229.5 sq. m.), stair and elevator construction. Completed equipment and inventory assembly for sports play area, track and field area, swimming pool and recreation are, water slide assembly (52 rm*), fitness and aerobic area, reception, dressing rooms and auxiliary rooms. Improvement work was done, including construction of a parking lot, sidewalks, pedestrian plazas from cobblestone (7155 sq. m.), landscaping (7295 sq. m.), ramps, wheelchair ramps, stairs, benches, waste containers, flag poles, stadium tribunes, fencing and other jobs were done. SIA Bildberg accomplished the idea about a place that would be a sports basis for Latvian athletes and a place for children and youth to develop, also to provide life quality of people living in the Municipality. SIA BILDBERG realizēja ideju par sporta bāzi Latvijas sportistiem, kā arī par vietu bērnu un jauniešu sporta attīstībai, novada iedzīvotāju dzīves kvalitātes nodrošināšanai.

Realized:

05.2015.-04.2017.

Client:

Siguldas Municipality council

Costs:

8 500 000 EUR

Date: